We finished the 300L brewery system for our Australia client.
The basic configuration is as below:
1. Brewhouse unit: mash/kettle tun,lauter and whirlpool in one tank but with two levels,upper level is for lautering,lower level is for whirlpool. Electric heating.
2. Fermentation unit: 2X 300L fermenters,1X 300L BBT.
3. Cooling unit:3P chiller+300L ice water tank.
4. Control unit:PID control with digital display.
5. CIP unit:50L portable CIP with trolley.