This is a 2000L brewery system what we are shipping to Romania, it will be installed in August of 2018, hope you can come for a visit.
The project main configuration is as below:
1. Milling unit:malt mill,flexi auger,grist hopper,grist hydrator.
2. Brewhouse unit: 20Hl mash/kettle tun,20Hl lauter tun,20HL whirlpool tun,steam heating,automatic Steam valve control.
5000L hot water tank,3500L cold water tank.
3. Fermentation unit:12X4000L fermenters, 3X2000L fermenters,2X 2000L brite tank.
4. Cooling system: 8000L glycol water tank+2X15hp chiller.
5. CIP system:150L CIP with trolley.
6. Control system: PLC control with two touch screens.
7. Double heads keg washer, Single head keg filler.
Candle filter machine,membrane filter machine.